Pulled from your real cost-code breakdown (672 codes, board sqm + edging + labour per code). Enter a code (e.g. B601, W602) into any line item description to auto-fill cost price. Adjust rates below to reprice every code instantly — see the full list on the Codes tab.
B Base · BS Base Sink · W Wall ·
P Pantry/Tall · V Vanity · D Drawer ·
iB Island Base · QB Corner Base · and more on the Codes tab.Use the Hide Price checkbox on each line to show the description only — no rate or total will appear on the client quote.
Enter benchtop line items here. These appear on the client quote at the exact price entered — no overhead or markup is applied.
| Description | Notes / Spec | Qty | Unit | Rate (ex GST) | Total |
|---|
Enter installation line items here. These appear on the client quote at the exact price entered — no overhead or markup is applied.
| Description | Notes / Spec | Qty | Unit | Rate (ex GST) | Total |
|---|
This text appears on the cover page of every quote. Edit it here to customise for your brand.
Add your internal costs below — labour, materials, edge banding, anything. These are never shown to the client. The total rolls up into the Cabinetry figure on the quote.
| Description | Qty | Unit | Rate ($) | Total |
|---|
Edit stage names and typical durations. These appear on the final page of the client quote.
| Add rooms and line items above to see totals. |
By signing below you confirm you have read and agree to the Terms & Conditions above.
| Code | Width | White m² | Colour m² | Carcase Edge m | Colour Edge m | Labour hrs | Cost Price |
|---|
| Client | Project Type | Fee | Status | Added | Notes |
|---|
This is your template — your branding, rates, and terms appear on every quote you create.
Upload a quote JSON file to create a new job in the pipeline. The client name, project details, and contract value will be pulled in automatically.